The project was located Mtwara City, Tanzania. The total length is 542km including 36" x 513 km onshore pipeline and 24" x29 km offshore pipeline. The scope of work include survey,basic design and EPC.
The project was located Mtwara City, Tanzania. The total length is 542km including 36" x 513 km onshore pipeline and 24" x29 km offshore pipeline. The scope of work include survey,basic design and EPC.